1、安装地点需保持通风良好,发电机端应有足够的进风口,柴油机端应有良好的出风口。出风口面积应大于水箱面积1.5倍以上。
1. The installation site should maintain good ventilation, with sufficient air inlet at the generator end and good air outlet at the diesel engine end. The area of the air outlet should be more than 1.5 times the area of the water tank.
2、安裝地的周边应保持干净,防止在周边置放能造成酸碱性、偏碱等腐蚀汽体和蒸气的物件。有标准的应配备救火设备。
2. The surrounding area of the installation site should be kept clean to prevent placing objects that can cause corrosion of vapors and vapors such as acidity, alkalinity, etc. Those with standards should be equipped with firefighting equipment.
3、 若在室内使用,必须将排烟管道通到室外,管径必须≥消音器的出烟管直径,所接之管路的弯头不宜超过3个,以保证排烟畅通,并应将管子向下倾斜5--10度,避免雨水注入;若排气管是垂直向上安装的,则必须加装防雨罩。
3. If used indoors, the smoke exhaust pipe must be connected to the outside, with a diameter ≥ the diameter of the exhaust pipe of the silencer. The elbows of the connected pipeline should not exceed 3 to ensure smooth smoke exhaust, and the pipe should be tilted down 5-10 degrees to avoid rainwater injection; If the exhaust pipe is installed vertically upwards, a rain cover must be installed.
4、基础采用混凝土时,在安装时须用水平尺测其水平度,使机组固定于水平的基础上。机组与基础之间应有专用防震垫或用底脚螺栓。
4. When the foundation is made of concrete, the levelness must be measured with a level ruler during installation to fix the unit on a horizontal foundation. There should be dedicated shockproof pads or anchor bolts between the unit and the foundation.
5、 发电机组机壳务必有靠谱的接地保护,对必须有中性点立即接地装置的发电机组,则务必由专业技术人员开展中性点接地,并配置防雷设施,禁止运用电压的接地系统开展中性点立即接地装置。
5. The generator unit shell must have reliable grounding protection. For the generator unit that must have a neutral point immediate grounding device, professional technicians must carry out the neutral point grounding, and configure lightning protection facilities. It is prohibited to use the voltage earthing system to carry out the neutral point immediate grounding device.
6、 发电机与市电的双向开关必须十分可靠,以防倒送电。双向开关的接线可靠性需经过当地供电部门的检验认可。
6. The bidirectional switch between the generator and the mains must be very reliable to prevent reverse power transmission. The wiring reliability of the bidirectional switch needs to be inspected and approved by the local power supply department.
7、 起动电瓶的接线必须牢固。
7. The wiring of the starting battery must be firm.
感谢您的阅读,此文的文章来源:
天然气发电机组更多的内容和问题请点击:
我们会继续努力的为您提供服务,感谢您的支持!
Thank you for reading. The source of this article is: Natural gas power generation units. For more information and questions, please click on:
We will continue to work hard to provide you with services. Thank you for your support!